Brady NetDoc User Manual Page 119

  • Download
  • Add to my manuals
  • Print
  • Page
    / 151
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 118
NetDoc™
User’s Manual
1-113 Rev B
Setting Up the Cabling Infrastructure
Identifying Backbone Pathways Used
The Pathways Used tab identifies the pathways in which the backbone is located. When
adding pathways, add them in order from Source to Destination.
To add pathways used:
1. Click the Pathways Used tab.
2. In the Detail area, click Add.
3. In the Location window, select the first Pathway this backbone is in, then click Accept.
The Segment, Pathway ID, Pathway Type, and Source are populated on the table.
4. Click Save.
Note: The Segment column identifies the order in which the backbone uses each of the
pathways.
Connecting a Backbone to a Grounding Conductor
If a Grounding Conductor has been set up in the Grounding tab and connected to the current
backbone, the Bonding Conductor ID field will be populated in the Backbone Info tab. See
“Grounding” on page 1-114.
Page view 118
1 2 ... 114 115 116 117 118 119 120 121 122 123 124 ... 150 151

Comments to this Manuals

Star 01 Feb 2024 | 22:27:34

Hey, Are you tired of missing out on potential profits in the volatile world of cryptocurrency trading? Look no further! I've got something special for you. Introducing the "GOD Trading Strategies" e-book, your ultimate guide to mastering successful crypto trading. For a limited time, you can get this comprehensive guide for just $19.95 instead of the regular $49. That's a whopping 60% discount! Here's what you get with "GOD Trading Strategies": In-depth insights into successf